Use case · Parts and sourcing
When a part goes end-of-life, arrive with alternates — not a respin.
Circuitly monitors the BOM between revisions and evaluates substitutions against the circuit each part actually serves. This page covers the ongoing capability — catching the same risks during a review is component and supply-chain risk.
The problem
A BOM degrades between revisions: parts go end-of-life, stock thins, a supplier consolidates. When the notice finally lands, the alternate hunt happens under deadline — by someone without the context that made the original choice. The substitution that looks pin-compatible on the parametric table quietly breaks the circuit it sits in.
Connected workflow
Because the harness holds the design next to the component data, Circuitly watches the BOM continuously and evaluates alternates against the requirement and circuit each part serves — not just the parametric row. Every proposal states its trade-offs, and every substitution lands as a diff an engineer approves.
Connect
The BOM, resolved from the native design, plus supported component data sources.
Monitor
Lifecycle, stock depth, and sourcing exposure, tracked between revisions.
Evaluate
Alternates scored against the circuit and requirement the part serves, trade-offs stated.
Decide
The engineer approves each substitution as a reviewable diff.
Sourcing output
- U5 flagged last-time-buy at two distributors — before the buyer finds out the hard way
- Pin-compatible buck alternates, with the feedback-divider implication called out
- A second source identified for a 0.1% 10 kΩ 0402 nobody wanted to think about
- X7R vs X5R trade-off stated during selection, not discovered in thermal test
Engineer decision
A substitution is an engineering change, not a procurement swap. Circuitly prepares the candidates, the constraints they must satisfy, and the trade-offs; the engineer who owns the circuit approves the change.
See what your BOM will look like in six months.
Connect the design and the component data, and get the risk list before it becomes a schedule.